Agency Department of Transportation (501)
Measure Name Percentage of Construction Quality Improvement Program (CQIP) specification checkpoints deemed to be in compliance
Measure Last Modified
11-10-2025 03:49 p.m.
Measure Last Published
10-21-2025 02:49 p.m.
Status
Active
Data Source and Calculation
VDOT's Construction Division (CD) collects and analyzes construction project data including compliance with the Construction Quality Improvement Program (CQIP). Effective in 2025 the calculation methodology is as follows: For each contract, it's Total CQIP Score is based only on the criteria within the specification section associated with that contract, and only criteria found to be in non-compliance of that contract are recorded. The CQIP compliance score is calculated as 1 - (number of non-compliance / Total Score) * 100. The Total Score is the equivalence of Total Question Asked in the old CQIP system and Compliant Responses equals to (Total Score - Non-Compliant Responses). Here is the note on calculation prior to 2025: Construction Division tracks the number of CQIP quality checkpoints found to be in-compliance as a percentage of the total number of checkpoints reviewed for the period, and presents this as the reporting period’s overall CQIP score. VDOT uses CQIP information as part of the overall program of maintaining and improving the quality of construction projects. Values reported here represent year-to-date results that are updated quarterly, which will change as the year progresses. Updates are typically available from CD mid-month after period end.
Enterprise Priorities and Strategies
Initiative Priority Strategy
Transportation Prioritization Develop a transparent, data-driven prioritization model to help determine allocations of transportation funding and ensure ongoing accountability
Associated Service Areas
Service Area Code Service Area Name
60315 Highway Construction Program Management
Targets and Baselines
Name Date Result Note
Baseline 06-30-2018 94.7 Result from fiscal year 2019 based on VDOT Construction Division analysis and reporting.
Short Target 2025 06-30-2025 91.0
Long Target 2027 06-30-2027 91.0
Baseline None
Results
Year Result Note
2019 94.7 Result from fiscal year 2019 based on VDOT Construction Division analysis and reporting.
2020 96.0 Result from fiscal year 2020 based on VDOT Construction Division analysis and reporting. Note: Historical data reflects data as of report run date not 35th day after of end of FY
2021 96.2 Result from fiscal year 2021 based on VDOT Construction Division analysis and reporting. Note: Historical data reflects data as of report run date not 35th day after of end of FY
2022 95.6 Result from fiscal year 2022 based on VDOT Construction Division analysis and reporting. Note: Historical data reflects data as of report run date not 35th day after of end of FY
2023 96.1 Result from fiscal year 2023 based on VDOT Construction Division analysis and reporting. Note: Historical data reflects data as of report run date not 35th day after of end of FY
2024 95.3 Result from fiscal year 2024 based on VDOT Construction Division analysis and reporting.
2025 95.6 Result from fiscal year 2025 based on VDOT Construction Division analysis and reporting.
2026
Measure ID 50160315.002.001
Measure Class Other Agency
Measure Type Outcome
Year Type State FY
Preferred Trend Stable
Frequency Annually
Statistical Unit Percentage