Measure Last Modified
09-12-2024 12:05 p.m.
|
Measure Last Published
08-26-2022 04:28 p.m.
|
Status
Active
|
Data Source and Calculation
The data will come from yearly agency reef construction and augmentation records of materials placed on reef sites. A running average of work done from 1993-2005, excluding 2002, an abnormally high tonnage year, had previously served as the baseline, and the agency worked diligently to achieve this target of 6,384 tons per year. However, with the state of the economy, the high price available for recycled concrete and the lack of available concrete for donation to the agency Reef Program, which had been the bedrock of the program, the target amount is being revised downward. Each calendar year the tonnage placed on all reef sites during the past year will be totaled. The agency's goal will be to place an amount of tonnage, each calendar year, that equals or exceeds the tonnage placed in the last 2 calendar years.
|
Enterprise Priorities and Strategies |
Initiative |
Priority |
Strategy |
Service Area Code |
Service Area Name |
50506 |
Artificial Reef Construction |
Name |
Date |
Result |
Note |
Baseline |
|
None |
|
Short Target 2025 |
|
None |
None |
Long Target 2027 |
|
None |
None |
Year |
Result |
Note |
1993 |
475.0 |
This measure includes activity covering an entire calendar year. |
1994 |
950.0 |
This measure includes activity covering an entire calendar year. |
1995 |
1,595.0 |
This measure includes activity covering an entire calendar year. |
1996 |
22,324.0 |
This measure includes activity covering an entire calendar year. |
1997 |
5,200.0 |
This measure includes activity covering an entire calendar year. |
1998 |
8,710.0 |
This measure includes activity covering an entire calendar year. |
1999 |
978.4 |
This measure includes activity covering an entire calendar year. |
2000 |
13,230.0 |
This measure includes activity covering an entire calendar year. |
2001 |
18,078.0 |
This measure includes activity covering an entire calendar year. |
2002 |
128,000.0 |
This measure includes activity covering an entire calendar year. |
2003 |
37,398.0 |
This measure includes activity covering an entire calendar year. |
2004 |
35,820.0 |
This measure includes activity covering an entire calendar year. |
2005 |
8,464.0 |
This measure includes activity covering an entire calendar year. |
2006 |
41,076.0 |
This measure includes activity covering an entire calendar year. |
2007 |
26,168.0 |
This measure includes activity covering an entire calendar year. |
2008 |
18,084.0 |
This measure includes activity covering an entire calendar year. |
2009 |
13,346.0 |
This measure includes activity covering an entire calendar year. |
2010 |
4,588.0 |
This measure includes activity covering an entire calendar year. |
2011 |
5,328.0 |
This measure includes activity covering an entire calendar year and 2011 data reflects all artificial reef deployment efforts for that calendar year. |
2012 |
3,361.0 |
Data for 2012 agency artificial reef augmentation (in tons) will not be available until late 2012. This allows the program to take credit for all deployments that take place in calendar year 2012. |
2013 |
4,037.0 |
Total tonnage is calculated for an entire calendar year so calendar year information for 2013 should be available in December 2013. |
2014 |
6,000.0 |
Total tonnage calculated for an entire calendar year of effort and performance data was not available until mid to late December 2014 |
2015 |
3,800.0 |
Total tonnage in calendar year 2015 placed on permitted Artificial Reef sites was 3,800.0 tons. This is less than the average of tonnage placed in 2013 and 2014 which is roughly 5,000 tons. Amount of tonnage placed overboard is affected by funding available for this work, the timing of the donations on which the program heavily relies and the availability of suitable reef material. |
2016 |
505.0 |
The agency relies on donation or materials of opportunity. Due to changed scheduling by the agency's planned donors, much of the tonnage expected to be deployed on permitted Reef sites in calendar year 2016 is now expected to be deployed in calendar year 2017. |
2017 |
10,325.0 |
The increase in tonnage in 2017 is almost entirely due to the large amounts of material deployed from the construction at the Lesner Bridge; most of the material went to the Cabbage Patch Reef. |
2018 |
|
|
2019 |
|
|
|
Measure ID |
40250506.001.001 |
Measure Class |
Other Agency |
Measure Type |
Output |
Year Type |
Calendar |
Preferred Trend |
Stable |
Frequency |
Annually |
Statistical Unit |
Tonnage |
|