Description

This amendment directs the VPA to include phase 2 of the feasibility study for Phase 2 of the Commonwealth Railway Mainline Safety Relocation Project as part of its long-range plan for the development of Craney Island. The terminal will be designed to serve super post-Panamax class vessels via a 50-feet navigation channel, direct interchange to the interstate highway system, and double-stack intermodal rail service. The terminal will be planned as a semi-automated operation, with a mix of manual and automated container handling equipment. The construction of Craney Island will increase container throughput on the west side of the Elizabeth River, away from the region s most congested tunnels and bridges, and in close proximity to rail facilities and distribution locations.

Funding Details
By Program Program Code Program Title FY 2016 FY 2017
By Fund Fund Code Fund Title FY 2016 FY 2017
Authorized Position Details
By Program Program Code Program Title FY 2016 FY 2017